| MATRIKS RENCANA JARINGAN TRANSMISI GAS BUMI NASIONAL |
| PULAU: NATUNA TIMUR |
| |
| No |
Sumber Gas dan Pengelola |
Data Jaringan |
Cadangan, Status 1 Januari |
Keterangan |
| Jalur |
Lokasi |
Kota/Kab |
Diameter (inci) |
Panjang (KM) |
ROW |
Kelas Lokasi |
Kategori |
Kapasitas (MMSCFD) |
Wilayah |
TSP,TBP |
MSP,MBP |
2P (T + M ) |
| 1 |
East Natuna |
East Natuna-Malaysia |
Natuna |
Riau |
28 |
614 |
OffShore |
1 |
1 |
600 |
Natuna |
33,985.1 |
19,756 |
53,740.8 |
|
| 2 |
East Natuna |
East Natuna - JDA |
Natuna |
Riau |
28 |
800 |
OffShore |
1 |
1 |
900 |
|
|
| |
| Catatan |
TSP = Terbukti Sudah Produksi |
Katagori 1 = Open Access |
| |
TBP = Terbukti Belum Produksi |
Katagori 2 = Dedicated Hulu |
| |
MSP = Mungkin Sudah Produksi |
Katagori 3 = Dedicated Hilir |
| |
MBP = Mungkin Belum Produksi |
|
| |
2p = Terbukti + Mungkin |
|
| |
|
|